| Observation |
Implication
|
|
After
2-3 hours
-
Reduced HC emissions
-
Reduction in CO emissions
-
Change in stack
temperature
-
Change in flame colour
-
Higher flame temperature
-
Increased combustion
efficiency
|
 |
more complete combustion |
 |
hotter burn |
 |
more BTU output
|
|
|
Up
to six weeks *
- Increased combustion efficiency
- Ability to reduce fuel flow while maintaining desired
BTU output (this may be adjusted automatically or manually, depending
on type of equipment and controls)
|
 | increased oxygenation |
 | more complete combustion |
 | hotter burn |
 | desired BTU output achieved with less fuel |
|
|
Long Term
- Reduction in carbon, varnish and soot build up in
equipment
|
 | more efficient operation |
 | reduction in equipment maintenance |
 | extended equipment life |
|
*maximum
magnetic flux saturation through the steel pipe can take up to six weeks |